Rainstorm damages newly built Kugbo Bus terminal in Abuja

A heavy downpour on Tuesday, April 7, caused a major traffic gridlock along the Nyanya–Keffi Expressway in Abuja, following severe damage to the Kugbo Bus Terminal. 

The rainfall impacted parts of the newly built terminal, with sections of the roof affected and debris scattered onto the highway, obstructing vehicular movement. 

The incident led to severe congestion along the busy corridor linking the Federal Capital Territory to neighbouring Nasarawa State, leaving many commuters stranded for hours.

The terminal was commissioned in June 2025

Comments

Popular posts from this blog

We were fighting over who infected the other with HIV- man arrested for k!lling girlfriend in Enugu speaks

20-year-old UNILORIN student commits suicide after ‘online lover’ absconded with N500,000 she lent him for his mother's 'breast cancer treatment'

IBEDC to upgrade metering system

Buhari's administration is a government of lying, by liars and for Liars - PDP

NDLEA grills Obi Cubana for alleged drug links